FORMING  DETAILS

Roof Construction


1. Adjust foundation lines until dimensions A & B are equal.

2. Check conc. out to out dimensions to drawing.
ALTERNATIVE METHOD

1. Locate transit over intersection of string lines,  (conc. O/O )
2. Sight along one line, swing transit 90o to establish adjacent  building line.

3. Check diagonally as above.


Roof Construction


Roof Construction

1. Anchor bolt sizes, pier, tie rod and footing sizes are indicated on foundation drawings.

2. All items supplied by others unless specified in contract.

3. Grease foundation bolt threads and nuts before setting..

 
Roof Construction

  

Home | Frames | Roofs | Walls | Colours | Details | Pictures
Steel Buildings | Metal Building | Roof Construction | Sheet Metal Roofing
Engineered Steel Buildings | Prefab Steel Buildings | Design Building | Sitemap

Copyright (c) A-Z Technical Bldg. Systems Inc. 01/01/2001